SPECIFICATION
SUMMARY SPECIFICATIONS
- Restored Historic façade from ground to 1st floor
- High performance thermal glazing from 2nd to 8th floor
- Private terraces on 2nd & 8th floors
- 3.4 m floor-to-ceiling height to reception area
- 2.7 m to upper floor offices
- 4 pipe fan coil unit air conditioning
- Flexible planning grid
- 1:10 base occupancy (person/m2)
- 4.0 kN/m2 office floor loading
- 25 W/m2 small power base load
- 2 no. passenger lifts serving all upper floors
- 1 no. firefighting / goods lift
- Lift waiting time <25 seconds
- 60 no. bicycle storage spaces
- 7 no. self-contained shower/changing rooms including a wheelchair-accessible shower
- Locker & drying room facilities
- Target LEED Gold and BER A-3 rating targeted
- Restored Historic façade from ground to 1st floor
- High performance thermal glazing from 2nd to 8th floor
- Private terraces on 2nd & 8th floors
- 3.4 m floor-to-ceiling height to reception area
- 2.7 m to upper floor offices
- 4 pipe fan coil unit air conditioning
- Flexible planning grid
- 1:10 base occupancy (person/m2)
- 4.0 kN/m2 office floor loading
- 25 W/m2 small power base load
- 2 no. passenger lifts serving all upper floors
- 1 no. firefighting / goods lift
- Lift waiting time <25 seconds
- 60 no. bicycle storage spaces
- 7 no. self-contained shower/changing rooms including a wheelchair-accessible shower
- Locker & drying room facilities
- Target LEED Gold and BER A-3 rating targeted